Mercedes-Benz Trucks presents the new eArocs 400 at bauma 2025

Resilient, powerful and efficient even under demanding operating conditions, both off-road and on the road: With these properties, the Arocs from Mercedes-Benz Trucks has been one of the most important players in construction haulage for years. Now there’s another attribute, because with the new eArocs 400 the first battery-electric variant of the tried-and-tested workhorse from Mercedes-Benz Trucks is now available. The locally CO2 -free and low-noise electric truck will celebrate its world premiere at this year’s bauma in Munich from 7 to 13 April. Mercedes-Benz Trucks is once again highlighting the innovations the company is using to drive forward the transformation to CO2-neutral drives on the vehicle side and how these solutions also benefit the construction industry.

Mercedes-Benz Trucks auf der bauma 2025 Mercedes-Benz Trucks at bauma 2025

A small series of 150 vehicles per year is currently planned for the eArocs 400 for selected EU30 markets. The vehicle will initially be available as a 32- and 41-ton variant in the 8×4 axle configuration with four different wheelbases and can be built as a concrete mixer or construction tipper. It thus covers essential applications for street-oriented construction transport. Thanks to its local CO2 neutrality during driving, the eArocs 400 can enter low- and zero-emission zones in inner-city areas and is also suitable for noise-sensitive environments such as residential areas, the environment of hospitals, schools and kindergartens as well as for night-time construction sites due to its low noise emissions. The Start of Sales is scheduled for the 1st quarter of 2026, the first delivery in the 3rd quarter of 2026.

Robust, kraftvoll – und nun auch vollelektrisch: Mercedes-Benz Trucks präsentiert auf der bauma 2025 den neuen eArocs 400/Robust, powerful – and now also all-electric: Mercedes-Benz Trucks presents the new eArocs 400 at bauma 2025
Robust, kraftvoll – und nun auch vollelektrisch: Mercedes-Benz Trucks präsentiert auf der bauma 2025 den neuen eArocs 400/Robust, powerful – and now also all-electric: Mercedes-Benz Trucks presents the new eArocs 400 at bauma 2025

Achim Puchert, CEO Mercedes-Benz Trucks: “With the new eArocs 400, we are now also bringing electrification to the construction industry, which is particularly important for our economy and society. Following the distribution and long-haul transport, we are continuing to expand our product range of battery-electric trucks. Now, it is crucial that policymakers promote the development of the charging infrastructure and create the necessary framework conditions for the economic operation of these vehicles.”

Stina Fagerman, Head of Marketing, Sales and Services at Mercedes-Benz Trucks: “The eArocs 400 drives locally CO2 -free and is at the same time as powerful and robust as our customers are used to from the conventionally powered Arocs. Its range is designed to cover essential applications for street-oriented construction haulage. Thanks to its battery drive, it is therefore particularly suitable for use in restricted or noise-sensitive environments such as inner cities or residential areas.”

Powerful electric drive and sufficient range for daily requirements 

For the new eArocs 400, Mercedes-Benz Trucks is adopting essential components from the eActros 600. In addition to the front box and the power take-off (PTO), this also includes the batteries based on lithium iron phosphate cell technology (LFP). These batteries feature in particular a high durability and a particularly high usable battery capacity.

Due to its significantly higher efficiency, the eArocs 400 is at least 50 percent more energy-efficient than a comparable diesel truck. It has an on-board electrical system voltage of 800 volts and two battery packs with an installed battery capacity of 414 kWh located in the battery tower directly behind the driver’s cab. The range as a concrete mixer is up to 200 kilometers without intermediate charging. Customers typically drive in single-shift operation, cover average daily routes of less than 100 kilometers and travel almost exclusively on paved roads. This makes the e-truck predestined for this application. With the construction tipper variant, the range increases to up to 240 kilometers without intermediate charging. The eArocs 400 can be charged with up to 400 kW via the standard CCS2 charging socket mounted on both sides of the vehicle. The two battery packs need approximately 45 minutes to charge from 20 to 80 percent.

The eArocs 400 is fitted with a powerful central engine with a 3-speed transmission and a continuous power of 380 kW and a peak performance of 450 kW. In combination with this technical powertrain solution, the tried-and-tested planetary axles of the Arocs can be used to continue to offer the ground clearance and off-road capability required for construction site deployment. The electric powertrain is integrated into the vehicle produced at the Mercedes-Benz plant in Wörth by the Paul Group based in Vilshofen on the Danube.

Multimedia Cockpit Interactive 2 with speech control

The Multimedia Cockpit Interactive 2, which is also installed in the eArocs 400, among other things, proves to be very helpful in everyday work, making the vehicle even more networked and better for daily construction site use. The 12-inch instrument display and improved touchscreen ensure intuitive operation – even on rough terrain. Another plus: Many functions can now be activated safely and quickly via speech control. The new Favorites menu also allows direct access to construction-specific functions such as power take-offs.

Attentive assistants on board

A key priority for Mercedes-Benz Trucks, especially in construction transport, is ensuring that drivers remain safe – both on the construction site and en route. To this end, the safety assistance systems installed[4] in the eArocs 400, such as Active Brake Assist 6, Active Sideguard Assist 2 and Front Guard Assist, enable drivers to detect hazards in good time, brake in good time and maintain an overview of the traffic situation. These electronic aids are particularly useful in mitigating the risks of inattentiveness caused by fatigue, stress, or distraction, reducing the chances of serious consequences for all involved. The systems not only comply with the standards of the General Safety Regulation (GSR) issued by the EU, which have been in force since 2022 and 2024 respectively, but in some cases exceed them in scope.

Bunları da beğenebilirsin